Hive · Software and service delivery

The connective layer for vehicle testing.

Hive ties each issue a driver or passenger raises to the logged vehicle data, camera frames and position from the same seconds.

Hive in use

The same issue, in the car and at the desk.

The passenger logs it on the move, against the test case on screen. The engineer opens it with the trace, the camera frames and the car's position already attached, without searching a logger file or asking the passenger which junction it was.

01Test services02SaaS03Hive+

Taking on pilots for UAT and final evaluation programmes running in 2027

Screen recording of the Hive passenger screen: starting a drive, raising an issue, setting a time adjustment and marking a repeat

Left: the passenger screen in the Hive demo environment. Right: an illustration of the ticket the engineer opens.

The problem

The fault note and the trace end up in different places.

A driver on a UAT route notes a hesitation pulling away from a junction at 10:18. The next day someone has to find 10:18 in the logger file, work out which test case the car was on and ask the driver what 'hesitation' meant. By the time the trace reaches the engineer who owns the fault, the car is out on another route and the detail that would have explained it is in nobody's notes.

Network data, driver notes, video and audio are usually stored separately, so timestamps drift and context is lost before anyone can investigate. Hive keeps them together from the moment the issue is raised. Try it on the right.Try it below.

Bus dataCameraDriver note :28:31:34:37:40:43:46 10:18:34 10:18:3110:18:34 10:18:4210:18:4110:18:4010:18:3910:18:3810:18:3710:18:3610:18:3510:18:3410:18:3310:18:32
Time adjustment on the note0 s−1 s−2 s−3 s−4 s−5 s−6 s−7 s−8 s−9 s−10 s

Put the sources on one clock first.Now move the note back to when the car showed the fault.Aligned. The ticket opens on the seconds the car showed the fault.

How the cycle changes

Root cause analysis starts on day two instead of day three.

This is the five-car UAT cycle the people behind Hive have run at several OEMs, laid out day by day with the people each day takes.

Typical cycleThree days to root cause
Day 1Drive and capture data1 coordinator, 5 drivers, 2 data engineers
Day 2Upload logs, align them and triage; raise issues1 project manager, 2 data engineers, 25+ triage engineers from 3–4 subject-matter groups
Day 3RCA starts after the handshake: each issue matched to its data and the driver's reportThen report and regression test plan
With HiveOne day to root cause
Day 1Drive, raise issues on the move with data attached, triage the same day1 coordinator, 5 drivers, 5 technical passengers
Day 2RCA starts in the morning, from tickets that already hold their dataNormal R&D operations, with the test plan updated as issues close
No handshake day
36+11people-days before root cause analysis can start, typical cyclepeople-days before root cause analysis can start, with Hive
Day 1: 8 peopleDay 2: 28 or more peopleDay 3: RCA starts after the handshakeDay 1: 11 peopleDay 2: RCA starts in the morning
CoordinatorDriversTechnical passengersData engineersProject managerTriage engineers

Modelled on a typical five-car UAT cycle, pending validation in pilot. That gives three days to one, and about a third of the resource needed to reach root cause. We will publish the pilot result here when it is cleared for release.

Who built Hive

Engineers who have run final engineering sign-off.

The people who built Hive have run final engineering sign-off at OEMs, as chief engineers and as directors of commodity groups. That background shows up in small decisions in the tool, such as the time adjustment field and the one-tap duplicate.

We have run trials with three vehicle test organisations in 2026, and in 2027 we want Hive on live programmes.

Every trial and programme runs under NDA, and we never name customers without permission.

‘I have spent mornings searching a log file for 10:18 on programmes I ran. Hive is the tool we built so that stops being anyone's job.’

Michael-John Bull, Founder, Pi Nexus

Questions

What test teams ask us first.

Do we need to change our loggers?

No. Hive works over the loggers already fitted to your test fleet. It adds the link between a passenger's note and the logged data, and the logging stays as it is.

Does Hive replace our issue tracker?

No. Issues are raised and triaged in Hive with their data attached, then exported to the tracker your engineers already work in.

What do you need from us to start a service programme?

The vehicles and their keys, and the DBC files for the networks we log. A test specification and loggers are optional inputs: tell us what you already have and we will plan the programme around it.

How soon does an engineer see an issue?

With the smart data analysis level of service, issues reported on day 1 have outline data packets ready by 08:00 the next morning, subject to mobile network coverage.

Can we start with a pilot?

Yes. We are taking on pilots for programmes with UAT or final evaluation fleets running in spring and summer 2027, delivered as a service with our team in the cars or as the toolset for your own team.

Where do the three-days-to-one and one-third figures come from?

Both are modelled on a typical five-car UAT cycle, the one laid out above, and are pending validation in pilot. We will publish the pilot result when it is cleared for release.

Taking on 2027 pilots now

UAT or FEU fleets running in spring and summer 2027, as a service or as the toolset for your team.

Tell us your dates ›

Book a walk-through

See Hive on the demo environment in 20 minutes

Send us your programme dates and fleet size. We will walk you through Hive with test data and tell you plainly whether it fits your UAT or FEU programme.

We only use these details to arrange your walk-through and follow up on it. See our privacy notice.